UAS Marquee — Event Complex

Preliminary Electrical Set · Revision P1 · 9 A3 sheets · Issue FUS-1035 (parent FUS-1031)
Fusion Developers · 80′×150′ main hall + 80′×20′ lobby
ISSUED FOR COORDINATION / BUDGETARY DESIGN — NOT FOR CONSTRUCTION
Download full 9-sheet A3 PDF Download schedules (XLSX)

Sheet index

Load summary

ItemValue
Connected lighting load9.72 kW
Building connected (excl. HVAC)126.00 kW
Building maximum demand (excl. HVAC)72.18 kW
Total site connected246.00 kW
Total site maximum demand162.18 kW
Apparent power @ pf 0.90180.20 kVA
Recommended transformer (min, subject to DISCO)250 kVA

Key quantities (concept stage)

ItemQty
LED highbay 150W — main hall60
2×2 recessed panel 36W — lobby12
LED downlight 12W24
13A twin switched sockets34
Recessed floor service boxes18
Maintained LED exit signs (3 hr)7
Emergency bulkheads (3 hr)33
CCTV dome cameras 4MP PoE15
CCTV bullet cameras 4MP IP665
Facade lighting zones / allowance3 / 12 kW

Scope split

Included — building scope

  • Main LV panel (MDB) downstream of utility metering
  • Sub-boards DB-1…DB-4, EM-DB, SEC-DB and final circuits
  • Internal lighting, switching and controls
  • Small power, sockets and floor service boxes
  • Emergency and exit lighting, 3 hr integral battery
  • CCTV cameras, PoE switches, NVR, cabling, containment
  • Facade lighting feeders, containment and DB-4
  • Earthing and bonding within the building envelope

Excluded — by others

  • HT/LT transformer, RMU and substation civil works
  • DISCO/LESCO metering, connection and tariff fees
  • Standby diesel generator, ATS, fuel and acoustics
  • UPS, solar PV and battery energy storage
  • External site / street lighting beyond building line
  • Facade luminaires and specialist lighting design
  • Fire alarm, PA/VA, structured data and BMS
  • HVAC power beyond the MDB outgoing way
  • Civil trenching, ducting and builders work

Assumptions and limitations